Construction status in kamioka site

e) Construction status of the spherical tank reported on Oct.29,'99
20 plates of the lower temperate zone were installed.

20 plates were delivered in the Mozumi site. The second plate was installed. 
The fourth plate. The 15th plate.
The 18th to 20th plates. Installation was completed.

a) Construction of the spherical tank started. (reported on Sep.27,'99)

b) Constuction of the spherical tank in Oct.5,'99. 
Continuing the assemble of the stainless steel plates of the "temperate zone" of the tank.

c) Constuction of the spherical tank in Oct.14,'99. 
Installation of the 20 stainless steel plates at the "upper temprate zone" of the tank.

d) Construction of the upper polar region of the spherical tank.
Five plates (No.1-5) were successfully installed (reported on Oct.19, '99).